Equipment

MINERALS PROCESSING

FLSmidth has been chosen to supply the key technologies and services for Ma’aden’s phosphate three phase 1 mine site in the northern province of Saudi Arabia. The order placed on this Danish company is valued at approximately DKK 530 million and was booked in Q3 2023. The equipment is expected to be fully integrated during 2025.

FLSmidth has partnered with Ma’aden from the onset of the new phosphate mine operations starting with initial laboratory samples retrieved from the ore body in 2019 through to the development of the flowsheet and pilot scale testing.

Well-integrated technology

The focus of the collaboration has all along been to ensure that the integrity of the flowsheet is maintained, while ensuring that the technology is well-integrated into the overall plant design to deliver best possible performance from the process plant operators.

With this new order, FLSmidth will supply all of the key equipment associated with the phosphate beneficiation plant as well as technical support through the design, construction, commissioning and ramp-up phases.

The order includes both primary and secondary sizers, apron and HAB feeders, cone crushers, screens, cyclone clusters, ball mills, paste and high-rate thickeners, horizontal belt filter, slurry pumps knife-gate valves and flotation columns.

www.flsmidth.com

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button